Dear Editor:
The City of North Vancouver is on the verge of approving a 10-lane, 25-metre pool for the Harry Jerome replacement project. The Harry Jerome facility is in the most easily accessible location on the North Shore whether by car, bike, foot or public transit. If a 50-metre pool is not built now, there is a strong risk that no 50-metre pool will be built for at least another 60 years.
See more at: http://www.nsnews.com/opinion/letters/letter-sink-or-swim-for-50m-pool-at-harry-jerome-1.19993702